What was found
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND A .25 INCH CRACK AT BS 807 STR 8 AND 9L FUSELAGE FRAME AT FASTENER HOLE. REPAIRED PER SRM 53-00-07 FIG 202. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND A .25 INCH CRACK AT BS 807 STR 8 AND 9L FUSELAGE FRAME AT FASTENER HOLE. REPAIRED PER SRM 53-00-07 FIG 202. (X)