What was found
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND A 1 INCH AREA OF CORROSION AT BS 1016, RBL 31 FLOORBEAM. CORROSION LEVEL 2, CORROSION TASK NR C53-107-02. REPAIRED PER EA 65407. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND A 1 INCH AREA OF CORROSION AT BS 1016, RBL 31 FLOORBEAM. CORROSION LEVEL 2, CORROSION TASK NR C53-107-02. REPAIRED PER EA 65407. (M)