What was found
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND CORROSION AT CLIPNUT HOLE ON TOP OF FLOORBEAM 1 INCH BY 1 INCH BS 967, RBL 15, WL 208. CORROSION LEVEL 2. CORROSION TASK NR C53-107-02. INSTALLED DOUBLER PER SRM 53-30-51. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND CORROSION AT CLIPNUT HOLE ON TOP OF FLOORBEAM 1 INCH BY 1 INCH BS 967, RBL 15, WL 208. CORROSION LEVEL 2. CORROSION TASK NR C53-107-02. INSTALLED DOUBLER PER SRM 53-30-51. (M)