What was found
CLT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK IN FRAME 520 AT PSU SUPPORT STRINGER 8R FRAME. INSTALLED REPAIR DOUBLER PER SRM 53-00-07 FIG 202 AND SRM 51-10-02. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK IN FRAME 520 AT PSU SUPPORT STRINGER 8R FRAME. INSTALLED REPAIR DOUBLER PER SRM 53-00-07 FIG 202 AND SRM 51-10-02. (M)