What was found
CLT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK IN FRAME 907 AT RIVET IN PSU SUPPORT AT STRINGER 8L FRAME. DAMAGED REMOVED AND INSTALLED FILLER AND DOUBLER PER SRM 53-00-07 FIG 202 AND SRM 51-10-02. (M0
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK IN FRAME 907 AT RIVET IN PSU SUPPORT AT STRINGER 8L FRAME. DAMAGED REMOVED AND INSTALLED FILLER AND DOUBLER PER SRM 53-00-07 FIG 202 AND SRM 51-10-02. (M0