What was found
CLT - DURING Q-3 CHECK VISUAL INSPECTION, FOUND A 1 INCH BY .05 INCH AREA OF CORROSION ON FLOORBEAM STATION 344, RBL 2.5 AFT EDGE OF T-CAP. CORROSION LEVEL 1. SPLICED IN NEW T-CAP PER SRM 53-10-51 FIG 205. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-3 CHECK VISUAL INSPECTION, FOUND A 1 INCH BY .05 INCH AREA OF CORROSION ON FLOORBEAM STATION 344, RBL 2.5 AFT EDGE OF T-CAP. CORROSION LEVEL 1. SPLICED IN NEW T-CAP PER SRM 53-10-51 FIG 205. (M)