What was found
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND A 2 INCH AREA OF CORROSION AT BS 794.3, STRINGER 26R FLOOR SUPPORT BEAM, CORROSION LEVEL 2. INSTALLED NEW FLOOR SUPPORT SECTION PER SRM 53-10-05. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND A 2 INCH AREA OF CORROSION AT BS 794.3, STRINGER 26R FLOOR SUPPORT BEAM, CORROSION LEVEL 2. INSTALLED NEW FLOOR SUPPORT SECTION PER SRM 53-10-05. (M)