What was found
SJU - WITH THE LT IDG ON MEL, THE APU WAS OPERATING ON THE GROUND. APU PERFORMED AN AUTO SHUTDOWN. APU WAS RESTARTED AND SHUTDOWN AGAIN. AFTER SEVERAL ATTEMPTS AT REPLACING COMPONENTS, SURGE VALVE, ECU, LCIT SENSOR, THE APU WAS REPLACED. A VERIFICATION FLIGHT WAS PERFORMED SUCCESSFULLY ON 12 FEB 04. (M)