What was found
VALVE WAS REPLACED WITH NEW. HEATER OPERATED 30.4 HOURS SINCE WORK ACCOMPLISHED NEW VALVE DEVELOPED FUEL LEAK AT SOLENOID. (LARGE)(LEAK) REPLACED VALVE AGAIN.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
VALVE WAS REPLACED WITH NEW. HEATER OPERATED 30.4 HOURS SINCE WORK ACCOMPLISHED NEW VALVE DEVELOPED FUEL LEAK AT SOLENOID. (LARGE)(LEAK) REPLACED VALVE AGAIN.