What was found
AT FRAME STATION 280 BEAM FLOOR SUPPORT CTR CORRODED. RECEIVED SERVICEABLE 280 BEAM FLOOR SUPPORT CTR TO BE INSTALLED IAW SRM 51-42-06. WORK ORDER 80234 WORK CARD 1063 REPLACEMENT OF 280 BEAM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT FRAME STATION 280 BEAM FLOOR SUPPORT CTR CORRODED. RECEIVED SERVICEABLE 280 BEAM FLOOR SUPPORT CTR TO BE INSTALLED IAW SRM 51-42-06. WORK ORDER 80234 WORK CARD 1063 REPLACEMENT OF 280 BEAM.