What was found
FUSELAGE FRAME BS 333 IS CRACKED, BETWEEN STRINGER 1R & 2R. CUT AWAY DAMAGED FRAME, FABRICATED & INSTALLED NEW REPAIR PARTS IAW REO 670-53-21-1272 REV A. NDT PERFORMED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FUSELAGE FRAME BS 333 IS CRACKED, BETWEEN STRINGER 1R & 2R. CUT AWAY DAMAGED FRAME, FABRICATED & INSTALLED NEW REPAIR PARTS IAW REO 670-53-21-1272 REV A. NDT PERFORMED.