What was found
STRINGER 25R CORRODED BETWEEN FS 280 AND 295. CORRECTIVE ACTION: REMOVED FASTENERS, REMOVED CORROSION, OUT OF LIMITS, REMOVED HYD LINES TO FOM, CUT OUT DAMAGED AREA OF STRINGER, NDT CUT LINE, VERIFIED SPLICE MATERIAL, LOCATED AND DRILLED PARTS, TREATED, PRIMED, INSTALLED NEW STRINGER/SPLICE, TOP COATED, REINSTALLED HYD LINES IAW CRJ 700 SRM 51-42-02, 51-42-06, 51-21-06, 51-25-16, 51-42-10, 51-25-00, 51-21-11, 51-25-06, 51-21-03, 51-41-02, 53-00-03, 51-40-11 51-42-21, CRJ 700 NDTM PART 1 51-20-006.