What was found
FRAME 295 IS CORRODED BETWEEN STGR 25L AND 25R. CORRECTIVE ACTION: REMOVED CORRODED FRAME AREA AND INSTALLED REPAIR PARTS IAW GO JET ENGINEERING ORDER C700-53MR-004-R1 DATED 26 NOV 2018.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FRAME 295 IS CORRODED BETWEEN STGR 25L AND 25R. CORRECTIVE ACTION: REMOVED CORRODED FRAME AREA AND INSTALLED REPAIR PARTS IAW GO JET ENGINEERING ORDER C700-53MR-004-R1 DATED 26 NOV 2018.