What was found
PREVIOUS REPAIR ON OMEGA BEAM LT AT FRAME 19 IS CORRODED BEYOND LIMITS. REMOVED, FABRICATED AND INSTALLED NEW PATCH REPAIR WITH 2024T3 0.050 MATERIAL ON OMEGA BEAM LT AT FRAME 19 IAW EMB145 SRM 51-20-01, 51-21-04, 51-21-05, 51-30-01, AND 51-40-02. W/C 1086.