What was found
DURING C-CHECK, FOUND CORROSION ON STA 996 FLOORBEAM RT BL 44 UNDER NUT PLATE. REMOVED CORRODED SECTION OF THE BEAM, FABBED NEW SECTION FROM 60-15273 EXTRUSION 1 BY 40 BY 1 DRILLED DEBURRES, TREATED AND PRIMED IAW DC-9 SRM 51-10-4, 51-10-3 AND EO 98=863, INSTALLED NEW BEAM SECTION IAW DC-9 SRM 51-10-01 AND 51-10-2.