Service difficulty report · Warning System · Dorner DO328100

Difficulty date
December 30, 2000
Submitted
January 16, 2001
Operation
Air carrier
Aircraft
N426JS
Make and model
Dorner DO328100
Aircraft serial
3038
Aircraft time
14,681 hours, 13,346 cycles
Engine
Pwa PW119B
Propeller
Hartzl HDE6C3B
Part
Warning System
Condition
Failed
Location
Deice System
Part time
12,909 hours, 11,663 cycles
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFTER 10 MINUTES INTO THE FLIGHT, THE CREW RECEIVED AN AIRFOIL DEICE FAIL CAS MESSAGE. DISPATCH ADVISED THE CREW TO RETURN TO DAY WHERE MAINTENANCE INSPECTED AND REPLACED THE VERTICAL LEADING EDGE ASSEMBLY IN ACCORDANCE WITH DORNIER MAINTENANCE MANUAL 30-00-00. OPERATIONAL CHECKS WERE PERFORMED AND THE AIRCRAFT WAS RELEASED FOR SERVICE.