What was found
DURING SCHEDULED MAINTENANCE THE FS 409+128 VERTCLE POST WAS FOUND CRACKED. REPAIRS WERE MADE USING THE AIRCRAFT MAINTENANCE MANUALS AND AIRCRAFT WAS RELEASED FOR SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MAINTENANCE THE FS 409+128 VERTCLE POST WAS FOUND CRACKED. REPAIRS WERE MADE USING THE AIRCRAFT MAINTENANCE MANUALS AND AIRCRAFT WAS RELEASED FOR SERVICE.