What was found
DURING SCHEDULED MAINTENANCE THE FS 409+128 BULKHEAD VERTICAL POST WAS CRACKED. REPAIRS WERE ACCOMPLISHED USING AIRCRAFT MAINTENANCE MANUALS. AIRCRAFT WAS RETURNED TO SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MAINTENANCE THE FS 409+128 BULKHEAD VERTICAL POST WAS CRACKED. REPAIRS WERE ACCOMPLISHED USING AIRCRAFT MAINTENANCE MANUALS. AIRCRAFT WAS RETURNED TO SERVICE.