What was found
DURING SCHEDULED MAINTENANCE A CRACK WAS FOUND AT FASTENER HOLE AT FS 349. THE FASTENER HOLE WAS INSPECTED AND REPAIRED USING AIRCRAFT MAINTENANCE MANUALS. AIRCRAFT WAS RELEASED FOR SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MAINTENANCE A CRACK WAS FOUND AT FASTENER HOLE AT FS 349. THE FASTENER HOLE WAS INSPECTED AND REPAIRED USING AIRCRAFT MAINTENANCE MANUALS. AIRCRAFT WAS RELEASED FOR SERVICE.