What was found
DURING SCHEDULED MAINTENANCE THE PRESSURE BULKHEAD AT 202.75 HAS A 2 INCH CRACK. THE FS 202.75 PRESSURE BULKHEAD WAS INSPECTED AND REPAIRED USING AIRCRAFT MAINTENANCE MANUALS. AIRCRAFT WAS RELEASED FOR SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MAINTENANCE THE PRESSURE BULKHEAD AT 202.75 HAS A 2 INCH CRACK. THE FS 202.75 PRESSURE BULKHEAD WAS INSPECTED AND REPAIRED USING AIRCRAFT MAINTENANCE MANUALS. AIRCRAFT WAS RELEASED FOR SERVICE.