What was found
L WINDOW CRACKED IN FLIGHT ALONG WITH ARCING AT LOWER EDGE / REMOVED AND REPLACED L/H CAPT WINDOW IAW CRJ 700 AMM 56-12-01-000/400-801-A01-PSA REV D UP TO PG 7 STEP 28. PERFORMED RESISTANCE CHECK BETWEEN TEMPERATURE SENSORS PRIOR TO INSTALL. (S1-S2)-299OHMS, (S3-S4)-297OHMS AND (S5-S6)-288OHMS. RESISTANCE BETWEEN HEATER POWER TERMINALS (P1ANDP2)-9OHMS. STEP 29 TO CLOSE OUT NEEDS TO BE COMPLIED WITH. C/W INSTALLATION OF L/H CAPT. WINDOW I.A.W. CRJ700 AMM 56-12-01-400-801-A01-PSA STEPS 4.A.(29) TO CLOSE OUT. PERFORMED LEAK & PRESSURIZATION CK I.A.W. CRJ700 AMM 21-50-00-862-801-A02.