What was found
CENTER FUSELAGE, BS 669.40 - 855.40, REPLACEMENT OF THE BEAMS AT LBL 36 AND RBL 36; AND THE FLOOR ASSEMBLY BETWEEN FS693.00 AND FS847.00 WITH THE BEAMS INSTALLED AT BL 0; LBL 9, LBL 18, LBL 27, RBL 9, COMPLY WITH SB 670BA-53-036D. PERFORMED CENTER FUSELAGE, BS 669.40 - 855.40, REPLACEMENT OF THE BEAMS.