As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
FLOOR BEAM AT RBL 9 HAS HEAVY CORROSION FROM FS985 TO FS1033. RECEIVED AND COMPLIED WITH MHI RJ REO 670-53-61-2394 REV. -- DATED 2024-10-24 REPAIR STEP 1. COMPLIED WITH REMAINING STEPS OF REO 670-53-61-2394 REV - DATED 2024-10-24. COMPLIED WITH SRM 53-00-41-201-001-A01, 670-53-61-2394-1 & 670-53-61-2394-2.