What was found
CORROSION ON MACHINED BRACKET (8EAS) OF FLOOR STRUCTURE AT FWD CARGO BAY BTWN BS 517 - 661 + 16.00 AND STR 22L TO 26R. ON MACHINED BRACKET (4EAS) OF FLOOR STRUCTURE AT FWD CARGO COMPARTMENT BTW FS517.00 TO FS661.00 + 16.00 AND STGR 22LH TO 26RH PAINT WERE REMOVED PER CRJ-900 SRM 51-26-01-001-001-A01 AFTER CLEAN AREA DVI WAS PERFORMED PER CRJ 900 NDTM PART 1TASK 51-20-009-210 (CONFIGA01) AND NO CORROSION FOUND AND MACHINED BRACKET (4EAS) ON FS 517 TO 565 AND FS 629 TO 661+16 ON STRINGER 26 AREA IS OUT LIMITS (NOT ALLOWABLE DAMAGE ) PER CRJ-900 SRM-53-32-58-101-001-A01.AND WERE REPAIRED IAW REO 690-53-32-112 REV -.