As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
AT PREFLIGHT INSPECTION, THE CREW NOTED A SECTION OF EMERGENCY FLOOR LIGHTING THAT WAS INOPERATIVE. MAINTENANCE INSPECTED AND REPLACED THE 5LK EMERGENCY BATTERY PACK IN ACCORDANCE WITH DORNIER MAINTENANCE MANUAL 33-51-01. OPERATION CHECKS WERE COMPLETED AND THE AIRCRAFT WAS RETURNED TO SERVICE.