As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING PRE-TAXI CHECKS, THE CREW NOTED THAT A SECTION OF EMERGENCY PATHWAY LIGHTING WAS INOPERATIVE. MAINTENANCE INSPECTED AND REPLACED THE 5LK EMERGENCY BATTERY, IN ACCORDANCE WITH DORNIER MAINTENANCE MANUAL 33-50-00. OPERATION CHECKS WERE COMPLETED, AND THE AIRCRAFT WAS RETURNED TO SERVICE.