What was found
ACFT WAS UNDERGOING OVERNIGHT PLANNED MX THE MORNING OF 4/23/2011. DURING ACCOMPLISHMENT OF TASK CARD 521121-02-1-R2, A DOOR MECHANISM LUBE TASK, IT WAS NOTED THE ARM/DISARM HANDLE PLATE WAS LOOSE. UPON FURTHER INSPECTION, THE TECH FOUND THE ATTACHMENT HOLE CRACKED WHERE THE HANDLE PLATE ATTACHED TO THE DISARM LEVER, REF AIPC 52-13-22-02B, ITEM 300B, PN D5211005121700. INSPECTION OF THE ARM/DISARM LEVER ASSY REVEALED NO FURTHER DAMAGE. THE PART WAS REPLACED IAW AMM 52-13-22, RII WAS ACCOMPLISHED IAW CAMP 7.15. ALL OPS CHECKS WERE CARRIED OUT IAW AMM 52-13-22. THE ACFT WAS PLACED BACK IN SERVICE AND INCURRED NO DELAY DUE TO THIS ISSUE. THE HANDLE PLATE WAS SENT FOR EVALUATION. NO DETERMINATION AS TO CAUSE HAS BEEN MADE. ACCORDING TO THE OPERATORS RECORDS, ALL AD, SB, STC`S AND PMA`S ARE IN FULL COMPLLIANCE WITH THE TYPE DESIGN CERTIFICATE AND ASSOCIATED REQUIREMENTS.