What was found
AFTER SCHEDULED MAINTENANCE, ACFT WAS DISCOVERED ON BATTERY POWER, THE EMERGENCY LIGHTS WERE INOPERATIVE AT MANY SEAT LOCATIONS THROUGHOUT THE CABIN. MAINTENANCE R & R BATTERY AT THE EMERGENCY POWER SUPPLY UNIT, 11WL. SATISFACTORY OPS TEST PERFORMED IAW AMM 33-51-38.