What was found
DURING SCHEDULED MX, INSP NOTED DAMAGE TO A FRAME AT FUSELAGE STA 168 AND WATER LINE 121. MX PERFORMED A MAJOR REPAIR BY FABRICATING AND INSTALLING A DOUBLER IAW REPORT NR S-550-0047/07PRD AND SRM CHAP 51.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MX, INSP NOTED DAMAGE TO A FRAME AT FUSELAGE STA 168 AND WATER LINE 121. MX PERFORMED A MAJOR REPAIR BY FABRICATING AND INSTALLING A DOUBLER IAW REPORT NR S-550-0047/07PRD AND SRM CHAP 51.