What was found
PRIOR TO SLIDE RAFT DEPLOYMENT EGAT ADVISED THAT THE BOTTLE PRESSURE OF THE SLIDE RAFT INDICATED ZERO. THE PRESS TO TEST SYSTEM INDICATED NORMAL. THE SLIDE RAFT WAS DEPLOYED TO VERIFY PROPER DEPLOYMENT. THE SLIDE DEPLOYED BUT FAILED TO INFLATE. THE PRESS TO TEST SWITCH WAS INSPECTED AND FOUND TO BE WIRED INCORRECTLY. THE SLIDE RAFT ASSEMBLY WAS REPLACED IAW MM 25-61-1. REPLACED SLIDE RAFT ASSEMBLY. (M)