What was found
DURING "C2" CHECK INSPECTION, FOUND CORROSION AT BARREL NUT HOLE NR 1 RT. REAMED SUBJECT BARREL NUT HOLE TO 1.594" DIA, PER SECTION 7 OF E/O 02-5510-098 REV 03 AND FABRICATED REPAIR BUSHING PER SECTION 12 OF SAME E/O. CLEANED AND REINSPECTED BOLT AND BARREL NUT, REINSTALLED BARREL NUT WITH NEW PL1 WASHER. CONDITION CHECK SATISFACTORY.