What was found
DURING SCHEDULED MAINTENANCE (B-CHECK), MAINTENANCE CONTRACTOR IDENTIFIED CORROSION ON THE NR 3 ENGINE PYLON, LOWER FIREWALL, AT STA YN 233 TO YN 286. MAINTENANCE CONTRACTOR REMOVED CORROSION AND TREATED SURFACES PER REO-03778 AND SB 54-57. (X)