What was found
DURING LEVEL OFF, GREEN SYSTEM (LEVEL LO) LIGHT ILLUMINATED WITH QUANTITY LEVEL (0), PRESSURE 3000 PSI BEFORE SELECTING (DUMP) FOR GREEN SYSTEM PUMPS. CONTINUED FLIGHT TO SCHEDULED DESTINATION, AND SAFE LANDING. REPLACED RUPTURED HYDRAULIC LINE ON RT MAIN GEAR IAW AMM 20-23-11, BLEED AND LEAK CHECKED IAW AMM 32-43-00. LEAK AND OPERATIONAL CHECK OK, SERVICED GREEN SYSTEM TO FULL IAW AMM 12-12-29 AND RETURNED AIRCRAFT TO SERVICE