Service difficulty report · Bulkhead · Airbus A300B4203

Difficulty date
October 11, 2007
Submitted
April 28, 2008
Operation
Air carrier
Aircraft
N510TA
Make and model
Airbus A300B4203
Aircraft serial
100
Aircraft time
39,437 hours, 24,160 cycles
Part
Bulkhead
Condition
Cracked
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING ACCOMPLISHMENT OF CPCP TASK C53-310-02-00 AT M96 CHECK, LEVEL II CORROSION WAS FOUND ON AFT PRESSURE BULKHEAD AT STR TIE END ANGLE FITTING AT 35R. FABRICATED FITTING FROM 7076 T6511 EXTRUSION IAW SRM 51-10-40. APPLIED PROTECTIVE COATINGS IAW SRM 51-40-12. INSTALLED FITTING IAW SRM 51-30-30.

More about the Airbus A300 B4-203