What was found
AFTER TAKEOFF FROM MIA, NR 1 PACK INOP, UNABLE TO MAINTAIN PRESSURIZATION WITH NR 3 PACK. RETURNED TO FIELD FOR A SAFE LANDING. WHILE TROUBLESHOOTING, FOUND CONNECTOR FOR NR 1 PACK DIRTY, CLEANED AND REINSTALLED CONNECTOR IAW 747 MM 21-51-01 PAGE 401. OPS CHECKED GOOD IAW 747 MM 21-51-01 PAGE 404. A/C RELEASED TO SERVICE.