What was found
WHILE IN HEAVY CHECK/MAINT, PART OF HANGER CEILING STRUCTURE WAS DISLODGED BY SEVERE WEATHER AND IMPACTED THE TOP OF THE FUSELAGE. REPAIR WAS MADE IAW REO 690-53-31-339, REV-, DATED 2017-05-04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHILE IN HEAVY CHECK/MAINT, PART OF HANGER CEILING STRUCTURE WAS DISLODGED BY SEVERE WEATHER AND IMPACTED THE TOP OF THE FUSELAGE. REPAIR WAS MADE IAW REO 690-53-31-339, REV-, DATED 2017-05-04.