What was found
AT 11,000 FT DURING CLIMB OUT, LT OIL PRESS LOW AOP WITH FALLING LT OIL PRESS ON GAUGE <30 PSI & FALLING FAST. IAW QRH 72/14 WITH OIL PRESS BELOW 35 PSI, SHUT DOWN ENG. COMPLIED WITH QRH PROCEDURE 72.3, ENG SHUTDOWN, LANDED SINGLE ENG. IAW WORK ORDER 228642 REPLACED LT ENG. LEAK OPERATIONS CHECKED GOOD.