What was found
EMERGENCY POWER INOPERATIVE, WILL NOT TEST. R & R MAIN SHIP BATTERIES IAW AMM 24-30-01. OPERATIONS CHECKED NORMAL. EMER POWER TEST GOOD IAW AMM 24-23-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
EMERGENCY POWER INOPERATIVE, WILL NOT TEST. R & R MAIN SHIP BATTERIES IAW AMM 24-30-01. OPERATIONS CHECKED NORMAL. EMER POWER TEST GOOD IAW AMM 24-23-02.