What was found
LEFT ELEVATOR CONTROL TAB INBD END, PREVIOUS REPAIR DELAMINATED AT STATION XE 14.525. REMOVED DAMAGED AREA, FABRICATED REPAIR PARTS, ACCOMPLISHED HOT BOND REPAIR IAW SRM 55-04 PARA 3 FIG 2 PAGES 9 & 10. WORK ACCOMPLISHED ON WO 262843 M301 ITEM 337, WO 1012012-3500-0041, TOTAL TIME 36510.9 & TOTAL CYCLES: 24241.