What was found
PERFORMED EPSU SYSTEM TEST, RECEIVED MESSAGE "BAT/ EPSU (10WL) FWD L AND BAT/EPSU (11WL) EMER L. REMOVED AND REPLACED BOTH EPSU BATTERY (10WL FWD) AND (11WL EMER L), IAW AMM 33-51-38. OPERATIONS CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PERFORMED EPSU SYSTEM TEST, RECEIVED MESSAGE "BAT/ EPSU (10WL) FWD L AND BAT/EPSU (11WL) EMER L. REMOVED AND REPLACED BOTH EPSU BATTERY (10WL FWD) AND (11WL EMER L), IAW AMM 33-51-38. OPERATIONS CHECK GOOD.