SDR XN0A1322

Service difficulty report · Duct · Airbus A300B4203

Difficulty date
April 26, 2006
Submitted
May 2, 2006
Operation
Air carrier
Aircraft
N474AS
Make and model
Airbus A300B4203
Aircraft serial
219
Aircraft time
37,963 hours, 19,257 cycles
Part
Duct
Condition
Blown
Location
Bleed Air
Stage of operation
CL
How discovered
O
Nature of condition
E
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CLIMBING TO 6000 FT MSL FEET, HEARD LOUD BANG FOLLOWED BY VIBRATION. MAINTENANCE IN PROCESS. DURING T/S FOUND NR 1 ENGINE BLEED AIR PACK BLEED AIR DUCT BLOWN, INCLUDING SEAL ASSYS. REMOVED AND REPLACED NR 1 ENGINE PACK BLEED AIR DUCT ASSY AS REQUIRED, OPS AND LEAK CHECKS GOOD. PERFORMED INSPECTIONS AND VISUAL CHECKS OF THE FLIGHT CONTROLS AND ALL SURFACES. PERFORMED OPS AND FUNCTIONAL CHECKS OF ALL FLIGHT CONTROL SYSTEMS AS REQUIRED IAW A300 AMM CHAPTER 27-10-00, NO DEFECTS FOUND. INSPECTED NOSE LANDING GEAR AND LT & RT MLG ASSY'S I/A/W A300 AMM CHAPTER 32-10-00 NO DEFECTS FOUND. VISUALLY INSPECTED ENTIRE FUSELAGE, ALL ASSOCIATED EQUIPMENT, NO DEFECTS FOUND.

More about the Airbus A300 B4-203