Service difficulty report · Pin · Emb ERJ190100IGW

Difficulty date
March 8, 2010
Submitted
March 8, 2010
Operation
Air carrier
Aircraft
N183JB
Make and model
Emb ERJ190100IGW
Aircraft serial
19000007
Aircraft time
12,032 hours, 7,402 cycles
Part
Pin
Part number
354910
Condition
Corroded
Location
Bleed Air Sys
Part time
12,032 hours, 7,402 cycles
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FLT JB1328 BWI-BOS DIVERTED TO JFK, AT FL 270 BLEED 2 LEAK CAUTION MESSAGE ON EICAS. FOLLOWED QRH PROCEDURE MESSAGE CLEARED AFTER 1 MINUTE (END OF PROCEDURE), AT APPROX 5 MINUTES BLEED 2 LEAK CAUTION APPEARED. FOLLOWED QRH PROCEDURE ISOLATING OPPOSITE SIDE BLEED AND APU BLEED. DESCENDED TO 10000 FT PRESSURIZATION DUMP BUTTON (PUSHED IN) BLEED 2 LEAKED PERSISTED, DECLARED EMERGENCY DIVERTED TO JFK. MESSAGE CLEARED ON APPROACH AT LOWER THRUST SETTING. RE-APPEARED AFTER LANDING, LANDED 22R SHUTDOWN ENGINE NR 2, BLEED LEAK 2 MESSAGE CLEARED. MX T/S CMC ACTIVE MESSAGES SHOW ODS PACK LOOPS RT BLD C1&C2 MESSAGE'S. PERFORMED FIM 36-21-00-810-802-A, PERFORMED VISUAL INSPECTION OF BLEED DUCTS RUNNING ALONG LOOP 5, NO DEFECTS FOUND. BLEED OVERHEAT LOCATION WAS AT 6.25 ON CH2 & AS A BLEED 2 SHORT CONDITION AND 41.55 ON CH 1 AS A BLEED 2 OPEN CONDITION. REMOVED AND REPLACED CERAMIC PINS AT CONNECTORS P2146 & J 2348 DUE TO CORROSION PER AMM 36-20-01, PERFORMED AMS RESET AND ODS BIT PER AMM 45-45-00, FAULT CLEARED RAN NR 2 ENGINE NO MESSAGES. A/C RETURNED TO SERVICE.

More about the Emb ERJ 190-100 IGW