Service difficulty report · Line · Emb ERJ190100IGW

Difficulty date
April 7, 2014
Submitted
April 8, 2014
Operation
Air carrier
Aircraft
N249JB
Make and model
Emb ERJ190100IGW
Aircraft serial
19000045
Aircraft time
21,550 hours, 13,085 cycles
Part
Line
Condition
Leaking
Location
Hyd System
Stage of operation
CR
How discovered
O
Nature of condition
K, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DECLARED AN EMERGENCY AND ACFT DIVERTED DUE TO NR 2 HYD LOW QTY IN FLIGHT. AT 22 PERCENT DROPPED DOWN TO 6 PERCENT DOWN WITH A 2 PERCENT DROP EACH 6 TO 10 MINUTES. LANDED WITH 6 PERCENT AFTER LANDING PRESSURE WENT TO 8 PERCENT THEN 10 PERCENT AT GATE. ALL FLIGHT HYD SYS WORKED NORMAL FOR HYD SYS 2. AFTER INVESTIGATION FOUND NR 2 ENGINE DRIVEN PUMP PRESSURE LINE & CASE DRAIN PUMP LINE LEAKING AT UPPER FLARE. R & R BOTH LINES, HOSES, IAW AMM 29-11-01 & 20-10-03. LEAK CHECK OK. HYD FLUID CHECK NORMAL.

More about the Emb ERJ 190-100 IGW