What was found
DURING HEAVY MAINTENANCE, FOUND FWD LT FLOOR DOUBLER CORRODED FRAMES 13- 16, INSTALLED NEW FLOOR DOUBLER SRM 51-41-02. PRIMED AND TOPCOAT SRM 51-23-05, 51-23-06. THIS ITEM HAS BEEN CLASSIFIED AS A LEVEL 2 CORROSION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY MAINTENANCE, FOUND FWD LT FLOOR DOUBLER CORRODED FRAMES 13- 16, INSTALLED NEW FLOOR DOUBLER SRM 51-41-02. PRIMED AND TOPCOAT SRM 51-23-05, 51-23-06. THIS ITEM HAS BEEN CLASSIFIED AS A LEVEL 2 CORROSION.