What was found
DURING ROUTINE MAINTENANCE, THE EPSU BATTERY CAPACITY CHECK AT FIN 13 WL, 14 WL, 15 WL, FAILED. R & R EMERGENCY LIGHT BATTERIES AT FIN 13WL, 14WL, 15WL AS PER AMM 33-51-38. PERFORMED OPS CHECK. OPS CHECK PASSED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ROUTINE MAINTENANCE, THE EPSU BATTERY CAPACITY CHECK AT FIN 13 WL, 14 WL, 15 WL, FAILED. R & R EMERGENCY LIGHT BATTERIES AT FIN 13WL, 14WL, 15WL AS PER AMM 33-51-38. PERFORMED OPS CHECK. OPS CHECK PASSED.