What was found
DURING HEAVY MAINTENANCE, CORROSION WAS DISCOVERED ON THE DUMMY RAIL Y503.2, FRAMES 12 TO 16. REPLACED THE DUMMY RAIL IAW SRM 51-41-11 AND SRM 51-72-11.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY MAINTENANCE, CORROSION WAS DISCOVERED ON THE DUMMY RAIL Y503.2, FRAMES 12 TO 16. REPLACED THE DUMMY RAIL IAW SRM 51-41-11 AND SRM 51-72-11.