What was found
FT 2044, PBI-EWR. RT AND LT EMERG BATT POWER SUPPLY UNIT FAIL DURING TEST AT PTP. R&R RT AND LT EPSU IAW AMM 33-51-38 OPS CHECK SAT.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FT 2044, PBI-EWR. RT AND LT EMERG BATT POWER SUPPLY UNIT FAIL DURING TEST AT PTP. R&R RT AND LT EPSU IAW AMM 33-51-38 OPS CHECK SAT.