Service difficulty report · Floor Support · Emb ERJ190100IGW

Difficulty date
January 24, 2020
Submitted
January 28, 2020
Operation
Air carrier
Aircraft
N374JB
Make and model
Emb ERJ190100IGW
Aircraft serial
19000629
Aircraft time
18,865 hours, 13,119 cycles
Part
Floor Support
Condition
Corroded
Location
Frames 86-87
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING HEAVY MAINTENANCE, AEROMAN REPORTED CORROSION SPOTS FOUND ON THE FLOOR BEAM (P/N 170-65669-004) BETWEEN FR86-87. SEE REF /1/ EA FOR DETAILS. AEROMAN EVALUATED DAMAGE AGAINST SRM AND DETERMINED TO BE OUTSIDE OF THE SRM SCOPE. EMRBAER WAS CONTACTED AND PROVIDED REPAIR INSTRUCTIONS PER REF /2/ ETD, WHICH CONSISTS OF CUTTING OUT THE DAMAGED SECTIONS, FABRICATING AND INSTALLING FILLERS, REPAIR DOUBLER AND REINFORCEMENT ANGLES IN ACCORDANCE WITH REF /4/ SRM REPAIR PRINCIPLES.THIS EC E20-041-01 ACCOMPLISHES THE TEMPORARY REPAIR PER THE REF /1/ EA AND COMPLIES WITH REF /2/ ETD WITHOUT DEVIATION; THIS PERMANENT REPAIR HAS BEEN APPROVED VIA REF /2/ ETD & REF /3/ ANAC FORM AND IS CLASSIFIED AS MAJOR.

More about the Emb ERJ 190-100 IGW