What was found
DURING BATT CAPCITANCE CHECK AFT L BAT EPSU FAULTED; R & R AFT EPSU BATT FIN# 13WL REF 33-51-38 OPS CHK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING BATT CAPCITANCE CHECK AFT L BAT EPSU FAULTED; R & R AFT EPSU BATT FIN# 13WL REF 33-51-38 OPS CHK GOOD.