What was found
DURING HMV, EC E21-042-01 FUSELAGE / CENTER FUSELAGE III / FLOOR STRUCTURE BEAMS AT FR85 AND Y-273 & Y+273 / CORROSION - PERMANENT REPAIR /// THIS IS CONSIDERED A MAJOR REPAIR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HMV, EC E21-042-01 FUSELAGE / CENTER FUSELAGE III / FLOOR STRUCTURE BEAMS AT FR85 AND Y-273 & Y+273 / CORROSION - PERMANENT REPAIR /// THIS IS CONSIDERED A MAJOR REPAIR.